With ELMAG® quality check

Depreservation, degreasing and de-securing
Assembly up to operational readiness
Oil filling of gearboxes, oil baths and central lubrication systems
Testing of electrics, safety components and equipment
Test run on all gearshift and power levels
30-minute test run at the highest power level
Inspection and, if necessary, adjustment of machine tolerances,
e.g. V-belt tension and spindle concentricity
Testing of all machine functions

For lathes, additionally:

Reassembly of lathe chuck with marking of minimum tolerance
Measurement of the spindle nose for tolerance < 0.01 mm
Measurement of the lathe chuck
Adjustment of the tailstock parallelism

MIG/MAG/MMA/WIG welding equipment,
Plasma cutting equipment & induction heating equipment depending on the type of equipment:

Assembly of the unit, chassis assembly
Assembly of mains plug, gas hose, intermediate hose package
Connection preparation for gas or compressed air
Control line plug Assembly on hose package
Installation / activation of the water cooling unit for modular units
Filling with cooling liquid for liquid-cooled units
Short test run or test welding

Delivery period/shipping time:

When purchasing a machine with START UP SERVICE, please calculate an additional 2-3 weeks until delivery, the reconditioning will only be carried out promptly after the purchase.

Testing of all machine functions